MECHANICAL INSTALLATION SYSTEMS

Recent Case Studies

BARBICAN CENTRE
CITY OF LONDON

PERFORMING Arts centre

Removal of redundant pump set differential valves and dead legs. Replace with new isolation valves and strainers, 7 sets - 42mm to 200mm.

ADELPHI BUILDING,
COVENT GARDEN

Install of 200mm welded by-passes on a live system.

A truly iconic grade II listed prime commercial building with unparalleled views over the River Thames and Victoria Embankment Gardens.

TRAVEL LODGE, ILFORD

Remove and replace hot water system. A temporary boiler was used during works.